• الزبون: Total E&B Kurdistan Region Of Iraq
• السنة: 2013
• موقع المشروع: Kurdistan, Iraq
• مدة العمل: 1 month
• وصف موجز للمشروع: FNC manufactured and installed OPF Camp along with the associated civil and earth works the scope included the Earth works, Concrete works, Drainage systems and water treatment systems, Electrical Works and 20 Caravans.