• Client: Total E&B Kurdistan Region Of Iraq
• Year: 2013
• Project Location: Kurdistan, Iraq
• Contract Duration: 1 month
• Brief Project Description: FNC manufactured and installed OPF Camp along with the associated civil and earth works the scope included the Earth works, Concrete works, Drainage systems and water treatment systems, Electrical Works and 20 Caravans.
+964 750 748 5168
+964 751 800 5790
info@npbsco.com
South Industrial Area, Erbil, Kurdistan, Iraq