• الزبون: Exxon Mobil Corporation
• السنة: 2013
• موقع المشروع: Qara Hanjeer and Alqosh Blocks, Iraq
• مدة العمل: ٦ أشهر
• وصف موجز للمشروع: FNC has entered into a master service agreement with EMKRL to Engineer, procure and construct Qara-hanjeer Oil Field Development Project on Turn key basis. Construction and commissioning of OPF and Main Camps at Qara Hanjeer and Alqosh Blocks to include a Master service contract and performed civil works of the Main camp, OPF, ECP’s areas where the scope of work included, Earth works cut and fill, Compaction and excavation, Excavate of Berm and Ditch, Roads, Concrete works, Security Fence, Leach Field, Drainage systems.
The Capitol Construction Superintendent of Exxon Mobil, Mr. W. Jeff Moore wrote an Appreciation letter, stated the following: