Peshkhabir Warehouse Facility

Client: DNO Iraq AS.

Year: 2021 – 2022

• Project Location: PSK Oil Field, Zakho, Duhok Governorate.

• Contract Duration: 120 days

• Brief Project Description: FNC’s scope included the design, procurement, construction and commissioning of a warehouse facility 1680 m2. The activities included construction of concrete foundation, supply, fabrication and erection of coated carbon steel structure, cladding with insulated sandwich panels, electrical and plumbing works, firefighting and fire alarm systems. The constructed warehouse had internal offices space and was fully equipped with racking and shelves for storage, the warehouse floor was coated with an industrial epoxy system.

WhatsApp Image 2022-01-31 at 12.39.44 AM (1)WhatsApp Image 2022-01-31 at 12.39.44 AM (1)
WhatsApp Image 2022-04-20 at 2.24.10 PMWhatsApp Image 2022-04-20 at 2.24.10 PM
WhatsApp Image 2022-01-31 at 12.39.44 AMWhatsApp Image 2022-01-31 at 12.39.44 AM
WhatsApp Image 2022-01-31 at 12.39.46 AMWhatsApp Image 2022-01-31 at 12.39.46 AM
WhatsApp Image 2022-01-31 at 12.39.45 AM (1)WhatsApp Image 2022-01-31 at 12.39.45 AM (1)
WhatsApp Image 2022-01-31 at 12.39.45 AMWhatsApp Image 2022-01-31 at 12.39.45 AM
WhatsApp Image 2022-01-31 at 12.39.46 AM (1)WhatsApp Image 2022-01-31 at 12.39.46 AM (1)
33
WhatsApp Image 2022-04-20 at 2.24.18 PM (1)WhatsApp Image 2022-04-20 at 2.24.18 PM (1)
WhatsApp Image 2022-04-20 at 2.24.18 PMWhatsApp Image 2022-04-20 at 2.24.18 PM
11
11
22
WhatsApp Image 2022-04-20 at 2.24.12 PM (1)WhatsApp Image 2022-04-20 at 2.24.12 PM (1)
WhatsApp Image 2022-04-20 at 2.24.14 PM (1)WhatsApp Image 2022-04-20 at 2.24.14 PM (1)
WhatsApp Image 2022-04-20 at 2.24.15 PM (1)WhatsApp Image 2022-04-20 at 2.24.15 PM (1)