Kitchen & Dinning Facilities

FNC awarded design/builds
Erbil International Airport (eiA) largest Military coalition Dinning & Kitchen Facility in IRAQ

Design & Engineering
We are a creative in - house enterprise of planning, design, engineering + project management professionals. we regard value engineering and time management as key drivers of our success.
Built within TIME & BUDGET
FNC has the capability to design procure and construct the most complex and buildings to fit your needs with time and budget.
INSTALLATION PROGRESS OF KITCHEN EQUIPMENT
Click edit button to change this text. Lorem ipsum dolor sit amet consectetur adipiscing elit dolor
SERVING 1,500 MEALS
Click edit button to change this text. Lorem ipsum dolor sit amet consectetur adipiscing elit dolor
3D VISUAL WALK THROUGH
BUILT IN COLD STORAGE FACILITIES
Previous
Next

Project Description

Project Name: Construction of Dining Facility for Erbil, Iraq

Client: Kellogg, Brown & Root Services (KBR)  

Location:  Iraq-Erbil / Erbil international Airport

Project area: 2000 sqm

Project Duration: 90 Days

Completion date: July 1st, 2016

Project description: Construction of Dining Facility to include containerized kitchen and Dining tents on both sides to serve 500 personnel.

The project includes:

  • Site preparation works
  • Concrete foundation
  • Kitchen area
  • Serving area
  • Dining tents
  • Refrigeration containers
  • Freezer containers
  • Addressable fire alarm system
  • Electrical works
  • Mechanical works
  • HVAC
  • Fire suppression system
  • Backup air system
  • Provision of kitchen hoods
  • Commissioning

The kitchen area consists of 22 ea containers 3.66 m wide 12.1 m long with R-11 wall insulation and R-19 floor and ceiling insulation, the dining tents consist of steel structure with three layers of tent fabric and insulation in middle, with a fire retardant and weather proof/water repellent fabric able to withstand extreme weather conditions with winds up to Class C (80 mph) in accordance with ANSI/ASCE 7-93. Both of the tents spanning at 20 m and 24 m long.

The kitchen area includes two each refrigeration containers and two each freezer containers.

Client: Kellogg, Brown & Root Services (KBR) Location: Iraq-Erbil / Erbil international Airport Project area: 2000 sqm Project Duration: 90 Days Completion date: July 1st, 2016
Rate this project :
5/5