Design & construction of educational facilities
Design & construction of shorow 18 classroom school- kurkuk iraq
Project description
This project has been constructed in 2011 by means of turnkey project in NAZ city/Erbil the project was consist of 18 classrooms, two Administration department, six laboratories, multi-purpose hall and W/C the total area of the project is 5500 m2, 4000 is the total built up area, 220 m2 is the car parking zone and the rest is walk ways and green areas, playing yard this project has been finished in 180 working days. This project has been constructed using G550 high tensile light gauge galvanized steel. Being a turn key project FNC engineering department conducted all the design aspects of the project as per international LGS international building code and pre-fabricated all the structure at out manufacturing facilities in Erbil Kurdistan region. Fiber cement high impact walls panels were used in the exterior of the building as well as the interior. high density Rock wool Insulation was installed inside the walls as means of providing a high acoustic & thermal insulation barrier. The pitched roof of the building was cladded with durable and insulated roofing shingle that withstands the extreme high heat temperatures.

Ministry Of Education
Kurdistan Ministry of Education in conjunction with erbil province awards First National Company with the design & build of Erbil 18 Classroom Two story Project using Lights Gage steel Construction system on Turn - Key basis. Project duration : 180 days
Design & construction of basra university - basra - iraq
Project description
This project has been constructed in 2011 by means of turnkey project in NAZ city/Erbil the project was consist of 18 classrooms, two Administration department, six laboratories, multi-purpose hall and W/C the total area of the project is 5500 m2, 4000 is the total built up area, 220 m2 is the car parking zone and the rest is walk ways and green areas, playing yard this project has been finished in 180 working days. This project has been constructed using G550 high tensile light gauge galvanized steel. Being a turn key project FNC engineering department conducted all the design aspects of the project as per international LGS international building code and pre-fabricated all the structure at out manufacturing facilities in Erbil Kurdistan region. Fiber cement high impact walls panels were used in the exterior of the building as well as the interior. high density Rock wool Insulation was installed inside the walls as means of providing a high acoustic & thermal insulation barrier. The pitched roof of the building was cladded with durable and insulated roofing shingle that withstands the extreme high heat temperatures.

Ministry Of Education
Iraqi Ministry of Education in conjunction with Basra province awards First National Company with the design & build of basra university Two story Project using Lights Gage steel Construction system on Turn - Key basis. Project duration : 180 day
Design & construction of naz city 18 classroom school - erbil
Project description
This project has been constructed in 2011 by means of turnkey project in NAZ city/Erbil the project was consist of 18 classrooms, two Administration department, six laboratories, multi-purpose hall and W/C the total area of the project is 5500 m2, 4000 is the total built up area, 220 m2 is the car parking zone and the rest is walk ways and green areas, playing yard this project has been finished in 180 working days. This project has been constructed using G550 high tensile light gauge galvanized steel. Being a turn key project FNC engineering department conducted all the design aspects of the project as per international LGS international building code and pre-fabricated all the structure at out manufacturing facilities in Erbil Kurdistan region. Fiber cement high impact walls panels were used in the exterior of the building as well as the interior. high density Rock wool Insulation was installed inside the walls as means of providing a high acoustic & thermal insulation barrier. The pitched roof of the building was cladded with durable and insulated roofing shingle that withstands the extreme high heat temperatures.

Ministry Of Education
Kurdistan Ministry of Education in conjunction with erbil province awards First National Company with the design & build of Erbil 18 Classroom Two story Project using Lights Gage steel Construction system on Turn - Key basis. Project duration : 180 days
Design & construction " collage of agriculture" - kurkuk - iraq
Project description
This project has been constructed in 2011 by means of turnkey project in NAZ city/Erbil the project was consist of 18 classrooms, two Administration department, six laboratories, multi-purpose hall and W/C the total area of the project is 5500 m2, 4000 is the total built up area, 220 m2 is the car parking zone and the rest is walk ways and green areas, playing yard this project has been finished in 180 working days. This project has been constructed using G550 high tensile light gauge galvanized steel. Being a turn key project FNC engineering department conducted all the design aspects of the project as per international LGS international building code and pre-fabricated all the structure at out manufacturing facilities in Erbil Kurdistan region. Fiber cement high impact walls panels were used in the exterior of the building as well as the interior. high density Rock wool Insulation was installed inside the walls as means of providing a high acoustic & thermal insulation barrier. The pitched roof of the building was cladded with durable and insulated roofing shingle that withstands the extreme high heat temperatures.

Ministry Of Education
iraqi Ministry of Education in conjunction with Kurkuk province awards First National Company with the design & build of Kurkuk collage of agriculture Project using Lights Gage steel Construction system on Turn - Key basis. Project duration : 90 days