Erbil Dining Facility (Danger DFAC)

Client: KBR

Year: 2016

• Project Location: Old Erbil International Airport, Iraq.

• Contract Duration: 7 months and 28 days

• Brief Project Description: FNC Construction and commissioning of dining facility building consist of (kitchen: 24 caravan units, each unit 12m x 3.66m, dining area: 2 tents, each tent 24m x 20m, vestibules: 4 tents, each tent 8m x 3m) along with site preparation, civil work, electrical work, mechanical work, fire alarm and fire suppression system.

20160731_14534620160731_145346
20160215_115035_resized_120160215_115035_resized_1
20160215_115130_resized_120160215_115130_resized_1
20160215_115224_resized_120160215_115224_resized_1
20160215_150359_resized_120160215_150359_resized_1
20160215_150518_resized_120160215_150518_resized_1
20160215_150602_resized_120160215_150602_resized_1
20160215_163547_resized_120160215_163547_resized_1
IMG_20160216_145310IMG_20160216_145310
DFAC Construction (76)DFAC Construction (76)
DFAC Construction (90)DFAC Construction (90)
DFAC Construction (105)DFAC Construction (105)
DFAC Construction (112)DFAC Construction (112)
DFAC Construction (154)DFAC Construction (154)
DFAC Construction (161)DFAC Construction (161)
DFAC Construction (175)DFAC Construction (175)
DFAC Construction (3)DFAC Construction (3)
DFAC Construction (8)DFAC Construction (8)
DFAC Construction (15)DFAC Construction (15)
DFAC Construction (23)DFAC Construction (23)
DFAC Construction (31)DFAC Construction (31)
DFAC Construction (52)DFAC Construction (52)
DFAC Construction (70)DFAC Construction (70)
20160731_15202020160731_152020
20160731_14544620160731_145446
20160731_14550920160731_145509
20160731_14554520160731_145545
20160731_14570320160731_145703
20160731_14595520160731_145955
20160731_15003020160731_150030
20160731_15020120160731_150201
20160731_15043820160731_150438
20160731_15044720160731_150447
20160731_15071120160731_150711
20160731_15094820160731_150948
20160731_15122620160731_151226
20160731_15193520160731_151935