Ablution Chus

Construction and installation of three Ablution caravans 12m x 3.82m , Civil works, three concrete pads for Caravans , one concrete pad for water tank and one waste water tank underground concrete pad, supply and installation three water tanks with ladder and connections, underground galvanized steel waste water tank, two water pump set , supply and installation of air conditioners, sewage, water supply and electrical works.

• Project Location: Erbil International Airport-Iraq

• Construction period: 21 Days

• Effective of Work : 11th of Jul 2020

• Completion of Mobilization : 12th of Jul 2020

• Start of Work : 12th of Jul 2020

• Completion of Work : 2nd of Aug 2020

• Specific role in executing the project: Design, Engineering , supervision , Civil work, fabrication and construction

• Commissioning Experience: FNC Handed over the project Gradually after Testing the Electricals and Inspecting the Fire pumps along with the HVAC and no punch list.