• Client: US KBR
• Year: 2019
• Project Location: Old Erbil International Airport, Iraq.
• Contract Duration: 2 months
• Brief Project Description: FNC Provision and construction of 6 tents each (20 If. X 30 If.) including site preparation, civil work, concrete foundations, steel structure covered with 3 layers of fabric, electrical works, furniture provision and installation.
+964 750 748 5168
+964 751 800 5790
info@npbsco.com
South Industrial Area, Erbil, Kurdistan, Iraq