• Client: Government of Canada
• Year: 2019
• Project Location: Erbil International Airport-Iraq
• Contract Duration: 21 days
• Brief Project Description: Provision and construction of three ablution caravans (12m x 3.82m) per each, with all associated works that include: site preparation, civil works, three concrete pads for caravans, one concrete pad for water tank, one waste water tank underground, concrete pad, supply and installation of three water tanks with ladder and connections, underground galvanized steel waste water tank, two water pump set, supply and installation of air conditioners, sewage and water supply, electrical works.