Flood Recovery Service

Share

As a community responsible Company in the region, FNC offered a fast response flood damage cleanup service, Emergency 24/7 Flood Response in KRG, Rapid response is of the utmost importance in any disaster situation, including flooding. we believe that the quicker you can have a team of specialist flood damage restorers on site, the more likely it is that the loss/risk will be reduced considerably. That’s why we moved at first moment and start working alongside Government Teams to restore and recover the flooded locations.

The Recovery Service continued for four days included 64 hours of work. It covered many areas of Erbil Governorate inside and outside the city of Erbil, including Kawrgosk, Khabat, Kasnazan, Binaslawa, Zheyan, Roshnbiri, Darato, Qushtaba, Badawa, Taqtaq, Shary Zelan, Kornesh.

The site activities was consisted of Removal of Dirt, Opening Blocked Roads, Collecting Flooded Materials, Excavating Trenches, Loading Damaged Vehicles and Equipment, Cleaning and Washing Roads, Compacting unpaved Roads, and Providing Food for all onsite Personnel (Breakfast, Lunch, Dinner) over than 70 Meal-kit per each Meal.

The number of Manpower who participated reached to 246 persons. It included various ranks workers from Management Directors, Civil Engineers, Supervisors, Drivers, and operators. While the Number of vehicles reached 303 vehicles included JCB backhoes/Front loaders, Shovels, Water Tanks, Excavators, Bulldozers, Fuel Tanks, Lowboy, Bobcat, Dump Trucks, Crane Trucks, Steel Roller and 200 Ton Crane.